Building a new home is an exciting milestone, but it also comes with plenty of decisions, details, and moving parts to navigate along the way. As construction progresses and you get closer to completion, there’s often a strong focus on getting the keys and moving in. However, those final steps are just as important as every stage of the build itself.

This is where inspections are essential. Practical Completion Inspections (PCI) and Handover Inspections are often used interchangeably to describe the final assessment of a new build before it is officially complete.

These inspections are designed to identify defects, incomplete work, or areas that don’t meet the agreed standards before final payment is made. They provide a formal opportunity to document issues and require the builder to rectify them, helping ensure the home meets expected standards at the point of completion.

In this post, we’ll explain how PCI and handover inspections are typically used in practice, what they aim to achieve, and why they play such an important role in protecting homeowners during the final stages of a new build.

Key Takeaways

  • PCI and handover inspections are often used interchangeably in Australia, as both occur at the final stage of a new build and focus on identifying defects before keys are handed over.
  • A Practical Completion Inspection (PCI) is the most critical inspection point, as it happens before final payment and gives homeowners leverage to have defects rectified.
  • Practical completion means the home is safe, functional, and fit to live in, even if minor cosmetic issues remain.
  • Defects identified at PCI or handover must be addressed by the builder, particularly when they are clearly documented in a written defect list.
  • Independent inspectors are strongly recommended, as they provide unbiased advice and often identify issues homeowners and builders may overlook.
  • Common defects include poor paint finishes, damaged tiles, misaligned doors, plumbing leaks, electrical faults, and external cracking or drainage issues.
  • Major defects affecting safety or liveability can delay handover, while minor issues are usually resolved before final payment or during the maintenance period.
  • Skipping the PCI, rushing the inspection, or relying only on a walkthrough are common mistakes that can lead to costly repairs and disputes later.
  • Clear documentation and follow-up inspections protect homeowners, especially if defects are disputed after handover.

Are PCI vs. Handover Inspections The Same?

In a professional context, yes, they are often used interchangeably.

A Practical Completion Inspection (PCI), also commonly referred to as a handover inspection, is a critical step that takes place at the very end of a new home build, just before the builder formally hands the property over to you. In Australia, these terms are frequently used interchangeably by builders, inspectors, and homeowners because they occur at a similar stage of construction and serve the same core purpose.

Both a practical completion inspection and a handover inspection are focused on identifying defects, incomplete work, poor finishes, or items that don’t align with the building contract and approved plans. In practice, they are the mechanism that ensures issues are formally recorded and addressed before final payment is made and the keys are handed over.

However, it’s also worth noting that “handover inspection” is sometimes used more informally to describe the final walk-through that happens at settlement or key exchange. While the terminology may vary, the intent remains consistent: confirming that the home is finished to an acceptable standard and ready to be occupied.

Here is a closer look at the key differences:

Feature Practical Completion Inspection (PCI) Informal Handover Inspection
Common Usage Often referred to as a handover inspection in a professional context Often used as an informal term for the final walk-through
Timing Usually occurs 1–2 weeks before keys are handed over, when the builder declares the home practically complete Takes place at settlement or key exchange, after repairs are completed
Primary Purpose Identify defects, incomplete work, and quality issues Confirm previously identified defects have been rectified
Focus Detailed inspection of workmanship and contractual compliance Final verification that the home is ready to occupy
Inspection Scope Structure, finishes, plumbing, electrical, functionality, and compliance Same areas, with focus on confirming fixes rather than finding new issues
Typical Participants Homeowner, builder/site supervisor, optional independent inspector Homeowner and builder/site supervisor
Outcome Creation of a formal defect or “snag” list for the builder to address Final acceptance of the property and release of keys
Impact on Payment Defects must be addressed before final payment can proceed Final payment is typically made at or immediately after this stage
Level of Detail In-depth and comprehensive Usually quicker and more confirmatory

man writing a handover inspection checklist

What Is a PCI (Practical Completion Inspection)?

When a construction project is nearing completion, whether it’s a new residential home or a commercial building, the final stage of the build is typically marked by a handover inspection, more formally known as a Practical Completion Inspection (PCI).

Practical completion refers to the point at which the building work is considered “substantially complete” and “reasonably fit” for its intended use.

Put simply, the home should be safe, functional, and ready to live in, even if there are minor cosmetic issues still to be addressed. Small items such as touch-up paint, incomplete skirting, or minor finish inconsistencies may still exist, but they should not prevent the property from being occupied as intended.

The PCI is your final opportunity to identify defective, incomplete, or non-compliant work before releasing your final payment. Any issues found during the inspection are documented in a formal defect list, often forming part of a Certificate of Practical Completion. This ensures the builder is contractually obligated to address outstanding items and that you receive the home you agreed to in your contract.

The PCI process is typically initiated by the builder, who issues a Notice of Completion once they believe the home meets the requirements set out in the building contract. This inspection is typically scheduled around one to two weeks before the anticipated handover date, allowing time for any identified issues to be rectified without delaying settlement. At this stage, major construction work should be complete, utilities connected, and the property generally cleaned.

Key Areas Assessed During a PCI

A thorough Practical Completion Inspection covers all critical aspects of the property, including:

  • Structural Elements: Internal and external walls, ceilings, and flooring systems are inspected to assess overall structural integrity. This includes checking construction quality, visible defects, and any signs of movement that could affect safety or long-term durability.
  • Fixtures & Fittings: Windows, doors, frames, and permanent fixtures are reviewed for correct installation, alignment, functionality, and finish to ensure they meet the expected standard.
  • Safety Features: Stairs, balconies, railings, and safety barriers are examined to confirm they comply with current building codes and safety requirements.
  • Finishing Work: Visible finishes such as plastering, tiling, painting, and surface treatments are closely inspected to ensure workmanship meets both functional and visual expectations.
  • Building Systems: Plumbing systems are checked for correct installation and operation, while accessible roof areas are reviewed for construction quality and insulation compliance.
  • External Works: External brickwork, concrete elements, façades, drainage, and weatherproofing are assessed to ensure the property is well protected from environmental conditions and built to a durable standard.

Who Should Attend a PCI/ Handover Inspection?

The Builder’s Role

Before the inspection takes place, the builder or site supervisor will usually complete their own internal walkthrough. This includes carrying out quality assurance checks, identifying obvious issues, and preparing documentation for review. During the inspection itself, their role is to explain features of the home, answer questions, and record any defects or incomplete items that are identified.

While this process is important, it’s worth remembering that the builder’s inspection is still conducted from their perspective. Their goal is to reach completion, which is why additional eyes on the property are so valuable.

Your Role as the Property Owner

As the homeowner, your involvement is critical. This is your opportunity to walk through the property carefully and make sure it meets your expectations and matches what you agreed to in the contract. Take your time to check finishes, fittings, and functionality, and don’t hesitate to ask questions if something doesn’t look or feel right.

Active participation can be the difference between a thorough inspection and a missed opportunity. Even small concerns are worth raising at this stage, as they are far easier to address before final payment and handover.

inspector talking on smartphone about the building and pest inspection findings in room near table

Why an Independent Inspector Is Strongly Recommended

While engaging an independent building inspector during a PCI or handover inspection isn’t mandatory, it remains one of the most effective ways to protect yourself and your investment.

Independent inspectors work solely for you. They have no connections to builders, developers, or agents, which means their advice is completely impartial and focused on the condition of your home.

Unbiased Advice That Works in Your Favour

Builders carry out their own checks before handover, but these inspections are completed from the builder’s perspective. An independent inspector provides an objective assessment, with no pressure to rush the process or overlook issues to meet construction timelines. Their only priority is identifying anything that may affect the quality, safety, or value of your property.

Identifying Issues Others May Miss

Independent inspectors are trained to spot defects that homeowners can easily overlook. These can range from minor issues, such as cracked tiles, uneven finishes, or poorly aligned doors, to more serious concerns like moisture ingress, inadequate waterproofing, drainage problems, or other structural defects.

Many defects start small, but catching them early prevents them from developing into expensive repairs after you’ve moved in.

Ensuring Compliance With Building Standards

Independent inspectors understand current Australian building codes and standards, as well as typical contract requirements. They check that the completed home matches the approved plans, specifications, and inclusions outlined in your contract, helping ensure nothing has been missed, substituted, or glossed over.

Clear Documentation and Financial Protection

A professional inspection results in a detailed, written defect report. This report creates a clear list of items the builder is expected to rectify before final handover and payment. It also provides valuable documentation if questions or disputes arise later, reducing the risk of out-of-pocket costs for issues that should have been addressed earlier.

Confidence and Peace of Mind

Most importantly, an independent inspection gives you confidence. Confidence that your home has been thoroughly assessed, that issues have been properly documented, and that your best interests are front and centre during the final stages of the build.

What Happens If Defects Are Found?

Finding defects during a Practical Completion Inspection (PCI) or handover inspection is particularly common, and is exactly why these inspections exist. New builds are complex projects, and even well-managed construction can result in minor issues that need attention before the home is officially handed over.

The important thing to know is that any defects identified at this stage should be addressed by the builder before final settlement and handover, particularly when they are clearly documented.

Common Defects Identified at PCI or Handover

Defects can range from cosmetic issues to more serious problems. Some of the most commonly identified items include:

  • Painting & Walls: Scratches, chips, uneven paint coverage, or poor finishing.
  • Flooring & Tiling: Chipped or cracked tiles, scratched flooring, loose carpet edges, or uneven grout lines.
  • Doors & Windows: Doors or windows that don’t open or close properly, misaligned frames, damaged seals, or scratched glass.
  • Cabinetry & Fixtures: Misaligned cupboard doors, chipped laminate, damaged benchtops, or poorly installed fixtures.
  • Plumbing & Electrical: Leaking taps or pipes, low water pressure, non-functioning lights or power points, and incorrectly installed smoke alarms.
  • Exterior & Structural Items: Cracks in plaster or brickwork, damaged roof tiles, drainage issues, or incomplete external clean-up.

What Happens Once Defects Are Identified

When defects are identified during a PCI or handover inspection, the focus shifts to making sure those issues are properly addressed before the home is handed over. All defects are documented in writing, often with photos, so there is a clear and agreed record of what needs attention. This documentation helps avoid misunderstandings and ensures nothing is overlooked.

The builder is then responsible for fixing the identified items within a reasonable timeframe, usually before final payment or settlement takes place. Once repairs are completed, it’s common and strongly recommended to carry out a follow-up check to confirm the work has been done to an acceptable standard.

If any defects affect the safety, functionality, or liveability of the home, such as missing essential services or incomplete areas, handover may be delayed until those issues are resolved. This ensures the property is safe, functional, and ready for occupation before you take possession.

What About Defects Found After You Move In?

Most building contracts include a maintenance or defects liability period, commonly lasting between 3 and 12 months. Minor issues that appear after you move in, such as small paint touch-ups or settlement cracks, are usually addressed during this period.

However, defects that were present at PCI or handover should still be rectified, even if settlement has already occurred.

What If Defects Aren’t Fixed?

If a builder doesn’t address defects, it’s important to protect yourself by keeping everything clear and documented. Make sure all issues are recorded in writing on a signed and dated defect list so there’s no confusion about what needs to be fixed.

If you’re unsure whether repairs have been properly completed, an independent inspector can provide reassurance by checking the work and confirming it meets an acceptable standard. In situations where major defects affect safety or liveability, settlement may be delayed until those issues are resolved (although minor cosmetic items usually don’t justify withholding payment)

If cooperation from the builder becomes an issue, you can also seek support from the relevant building authority in your state or territory.

Male in safety helmet with bristle on his face standing before house porch and speaking to another person about the benefits of regular building and pest inspections
 

Common Mistakes Property Owners Make

The final stages of a build are critical, yet this is where many property owners unintentionally expose themselves to risk. Below are the most common mistakes we see, and why avoiding them can save you significant time, stress, and money.

Skipping the Practical Completion Inspection (PCI)

One of the biggest mistakes homeowners make is skipping the PCI altogether, often assuming the builder has delivered a flawless home. While this trust is understandable, it can be costly. Once the final payment is made and the builder is formally released, it becomes far more difficult to have defects addressed. Issues that could have been rectified easily at practical completion (whether cosmetic or structural) may later become the homeowner’s responsibility.

In many cases, defects discovered after settlement are not covered by insurance, leaving owners to fund repairs themselves. Depending on the issue, these costs can quickly escalate into the tens of thousands of dollars.

Rushing the Inspection

As construction wraps up, pressure tends to build. Builders are eager to finalise payment, moving arrangements are already in place, and excitement about moving in can take over. Unfortunately, this rush often leads to missed details at a time when careful inspection matters most.

Minor issues like chipped fixtures, uneven tiles, or poor paint finishes may appear cosmetic, but they often point to broader workmanship problems. Taking the time to inspect the property properly during handover helps ensure you receive the quality and standard you agreed to in your contract.

Not Getting Independent Advice

Relying on a simple walk-through without professional support is another common and avoidable pitfall. While homeowners may notice obvious issues, most are not trained to identify structural problems, compliance concerns, or other hidden defects.

Independent inspection reports provide expert insight and clear documentation, which can be crucial if defects are disputed after handover. Without this evidence, resolution becomes more difficult.

At BeSafe Property Inspections, our licenced inspectors carry out detailed pre-handover inspections to identify defects, confirm compliance with Australian standards, and provide clear, actionable reports. This independent assessment gives property owners the confidence and protection they need at one of the most important stages of their build.

Conclusion

Reaching the end of a new build is exciting, but also the stage where careful attention matters most. Practical Completion/ handover inspections exist to protect you, ensuring your home is completed to an acceptable standard before the keys are handed over.

By understanding how these inspections work, taking the time to inspect your property properly, and documenting any issues clearly, you place yourself in a far stronger position. Most importantly, investing in an independent inspector helps ensure nothing is missed and that the home you receive truly reflects what you agreed to in your contract.

Secure Your Final Inspection With Expert Handover Reports

If you’re approaching handover, BeSafe Property Inspections can help. Our professional handover inspections and detailed reports are designed to identify defects, confirm compliance, and protect you at this critical stage.

Book your handover inspection today

Featured news articles